All lanes of traffic at the Flint/Miller/Orion roundabout are open and clear for vehicle travel. The main break is complete and back filled. This main break was only in the green belt so there was not any roadway affected. The two main breaks from Saturday have been cold patched and tamped smooth for traffic.
The Village of Lake Orion closed southbound Orion Road just south of the roundabout for emergency water main repairs Thursday morning and reopened to traffic by Thursday evening.
Leave a Reply